Corporate Financial McLean III

The project includes the expansion of the corporate headquarters with a 30 story office building with 4 below grade and 8 above grade parking floors, 60,000 sf of retail space, at grade lobby and 12th floor skylobby, conference center, cafeteria and dining, connecting bridge to existing building and destination dispatch elevators.
Architect(s): Gensler & CRTKL
Construction Duration: 48 months
GSF: 1,700,000 sf; USF: 865,000 sf
Parking: 1380 spaces